Busy Times

by Steve Eshom on May 21, 2007

The past 3 weeks have been a whirlwind as I have helped Aaron put the finishing touches on GorgeRail and I chased steam across Washington and Oregon.  To top that off I write this on the eve of another 3 day chase as I follow the double header south from Tacoma and the 844 east to LaGrande.  Two steam trips in 3 weeks plus a railfan photography presentation, what a blast!

As with most things railroad certain aspects just never run on time.  The UP 844 was scheduled to leave The Dalles at 8am.  They opened the switch onto main 2 around 7:40.  After putting their train together and performing an appropriate air test, they pulled down to Crates arriving at 8:25.  At 8:20 the sun went behind a cloud and stayed there even as the 844 headed west around 9:30 after waiting for an eastbound.

844 at Crates

The farther west I travelled I could see the weather was not going to improve.  By 5:30pm when the doubleheader passed through Stielacoom it was quite dark.  Check out the fans hanging out of the train.  At this point I chose not to fight the railfan mobs in Tacoma and headed home.

Daylight Yellow

 

  • Robert
    Just wanted to let you know how much I enjoy your train shots from the west coast. We used to follow the NS steam program, but that has fallen to the wayside. My youngest son and I were lucky enough to get a cab ride in the NS 611. Thank you for the beautiful pictures of these wonderful steam engines.
blog comments powered by Disqus

Previous post:

Next post: